• Intervention repair of the pillars of 25th of April Bridge

    Repair and protection of the main pillars to increase the life of the structure

  • Electrochemical methods for repair of concrete structures

    Rehabilitation of access viaduct in the oil terminal berths and building of the Port of Sines.

  • Structural rehabilitation with a view to durability

    Rehabilitation of reinforced concrete silo raw materials Açoreana Society Soaps

  • Intervention on 25th of April Bridge

    Repair and protection of the main pillars to increase the life of the structure

35 YEARS
RESEARCH
AND DEVELOPMENT

Founded in 1980 with the aim to concentrate exclusively on rehabilitation of buildings, Stap is an SME with a strong emphasis on knowledge and innovation, which seeks to respond effectively to market needs in the area of specialized work constructively and structural nature.



News & Events