Projects

Church and Convent of São Francisco

Évora

Recovery / Requalification of the Church and Convent

2015

The Church and Convent of São Francisco underwent significant rehabilitation, conservation, and restoration works. The intervention program for the entire complex, which includes the Chapel of Bones as an integral part, involved executing works across several specialties.

Steps and techniques of intervention

The less visible interventions included structural reinforcement and the complete replacement of the existing roofs and their drainage systems to eliminate the main causes of anomalies in the buildings.

The sewage drainage networks and water supply networks were also restructured. These interventions, more visible to the public, included repair and/or conservation of exterior plaster, interior ceilings and walls, stonework, stained glass, and mural painting in the church.

The depth of the intervention also covered the conservation and restoration of other integrated and movable artistic heritage, correction of lighting systems, electrical and telecommunications networks, as well as a new air conditioning system for the museological spaces.

The recent rediscovery of the old monks’ cells wing of the convent was also rehabilitated, including the replacement of the roof that previously existed, to highlight the architectural ensemble’s collection.

Due to the cultural and historical importance of the complex, the most appropriate rehabilitation and restoration techniques were employed, always aiming to protect this historical heritage and adapt it to its new functions, such as the creation of museological spaces.

Results

With the completion of the works in this architectural complex, visitors now benefit from a covered passage along the cloister, with the dual purpose of restoring the architectural value of the space and creating a reception and waiting area for visitor groups. Visitors can also admire the royal gallery overlooking the main chapel, fully rehabilitated, as well as the cloister and surrounding areas.

Additional information

Since the space is used simultaneously by devotees and visitors, a new accessibility and support services system was created for the complex to separate worship and liturgy routes from visitor circuits.

TECHNICAL DATA

LOCATION: Praça 1.º de Maio, 38, Évora

CLIENT: Fábrica da Igreja Paroquial da Freguesia de S. Pedro, Évora

OWNER: Fábrica da Igreja Paroquial da Freguesia de S. Pedro, Évora

ARCHITECTURE: Adalberto Dias Arquiteto Ld.a

STRUCTURAL ENGINEER: GEPECTROFA – Gabinete de Estudos e Projetos de Engenharia Civil da Trofa, Ld.ª

SUPERVISION: AFAPLAN – Planeamento e Gestão de Projetos, Ld.ª

PROJECT DIRECTOR: Eng. Frederico Lopes

BUDGET: € 3 360 000,01

EXECUTION TIME: 12 months

Applied Technique